← Back to home
Symbench
Operational Digital Twin · v2.0
Supply chain · seen as one system

Four files in.
A living operational
twin out.

Upload Purchase, Inventory, Production, and Shipments exports. Symbench builds your digital twin in minutes, answers questions in plain English, and adds AI agents like the Smart Scheduler.

PURCHASE INVENTORY PRODUCTION SHIPMENTS CUSTOMER TWIN
The problem

The data exists.
The connections don't.

Operations teams already export the truth every week — from purchasing, inventory, production, and shipping systems. But traditional visibility programs demand clean enterprise master data, long modeling projects, and heavy integration before anyone sees a connected flow.

4–6 hours a day
Planners spend that long reconciling purchase, inventory, production, and shipment spreadsheets, and the business still pays for it in stockouts, waste, and late orders.
DISCONNECTED VISIBILITY

Procurement, inventory, production, and fulfillment each tell a partial story.

WEAK TRACEABILITY

No line of sight from raw material to parent output to shipped product.

MASTER-DATA DEPENDENCE

Programs stall waiting on manually curated entity and material masters.

INVISIBLE MOVEMENT

Real routes and handoffs can't be seen directly from the files teams already have.

How it works

Master data, derived — not curated.

Five specialized stages turn raw exports into an explainable operational model. Every derivation is deterministic; humans review only when evidence is ambiguous.

STAGE 01

Librarian

CATEGORIZE

Recognizes each upload as Purchase, Inventory, Production, or Shipments — no configuration, no templates.

STAGE 02

Extractor

FIND

Finds every supplier, storage bay, production line, warehouse, and customer site in the records.

STAGE 03

Mechanic

MAP

Maps raw customer headers to operational standard fields with deterministic, file-aware rules.

STAGE 04

Weaver

LINK

Links lots and part numbers across files to derive bills of materials and supply routes.

STAGE 05

Director

SEQUENCE

Orders every event from purchase to delivery, checks consistency, and publishes the live twin.

The operational twin

Every entity real. Every edge a verb.

BUYMOVE-INMAKEMOVE-OUTSELL
BUY BUY MOVE-IN MAKE MOVE-OUT SELL SELL SUP-014 supplier SUP-021 INV-BLR inventory_location PLANT-03 production_facility WH-N2 warehouse DC-EAST distribution_center CUST all customers · collapsed SQL-backed · no phantom nodes · partial data renders truthfully, never faked
Traceability

One thread, from raw material to shelf.

Child / RM Item
RM-8841
→
SKU
SKU-2205
→
Parent Item SKU
PI-0067
→
FG SKU
FG-0067-A
→
UPC SKU
0 43000 11
trace workOrderId = WO-55102
├─ BUY      SUP-014 → INV-BLR · PO-99231 · received 2026-05-02 · qty 1,200
├─ MAKE     PLANT-03 · RM-8841 → PI-0067 · good 1,140 · scrap 60
├─ MOVE-OUT PLANT-03 → DC-EAST · movement 2026-05-11
└─ SELL     DC-EAST → CUST-2210 · FG-0067-A as UPC 0 43000 11
⚠ coverage: inventory file spans 2026-04 → 2026-05 only — earlier legs unavailable

Trace by SKU, child item, work order, or UPC. Every segment carries evidence, dates, and honest coverage warnings — provenance is the product.

Data Assistant

Ask the twin anything.

"Which 5 production lines produced the most output by weight?"
SELECT production_line, SUM(quantity_lbs) AS total_output_lbs
FROM production_history
WHERE quantity_lbs IS NOT NULL
GROUP BY production_line ORDER BY total_output_lbs DESC LIMIT 5 · read-only · workspace-scoped
Line 45
Line 21
Line 23
Line 08
Line 07
▸

Read-only by construction. Single SELECT statements only — mutations, comments, and out-of-scope tables are rejected before execution.

▸

Workspace-scoped. Every query is wrapped in workspace CTEs. Eight operational tables exposed, nothing else.

▸

Shows its work. Every answer comes with its SQL and a plain-English explanation, as a table or chart you can export to Excel.

Agent · Smart Scheduler

Sequence every line. Cut changeover waste.

Order-received sequence
A · 15 · ClearB · 40 · DarkC · 18 · ClearD · 38 · Dark
1,500 lbs waste · 4.0 h changeover downtime
Smart Scheduler sequence
A · 15 · ClearC · 18 · ClearD · 38 · DarkB · 40 · Dark
120 lbs waste (−92%) · 0.8 h downtime (−80%)
▸

Essential rules, never broken. One job per line, shift calendars and maintenance windows, material on hand, equipment capability.

▸

Efficiency goals, optimized. Size, material, and format progression, balanced against customer due dates.

▸

Seconds, not hours. Quick Draft in under 30 seconds or Deep Optimization in 3–5 minutes, with ABC–XYZ classification built in.

Smart Scheduler pilot results

Measured with a high-mix manufacturer.

−32%
Setup & changeover waste
+18%
Line capacity utilization
98.4%
On-time in-full delivery
<30s
To build a schedule, down from 4–6 hours
SSO & MFARole-based accessDaily backups · point-in-time recoveryPrivate workspace per site
Market

Proven in manufacturing. Built for any network.

Every business that buys, stores, moves, and sells already exports the same four files. We start where changeovers hurt most, then expand with new agents, not a new product.

Now

Manufacturing

High-mix plants. Smart Scheduler proven in a plastics pilot, with a pipeline in building materials, food ingredients, and industrial and consumer equipment.

Next

Distributors & wholesale

Stock runway at every warehouse, supplier risk on customer orders, and lot tracing to the accounts that received it.

Next

3PL & logistics

Every lane and carrier on one map. Close a lane with Mute Flow and see which shipments reroute and which arrive late.

Later

Multi-location businesses

Restaurants and other multi-site operators: purchasing, stock, and deliveries connected across every location.

Why it wins

Deterministic. Explainable. Fast.

No master-data project

Entities, materials, bills, and routes are derived from transactions your team already exports. The six-month prerequisite disappears.

No black boxes

Deterministic mapping, evidence on every derivation, human review only for genuine ambiguity. Partial data renders truthfully — never faked.

No exotic infrastructure

PostgreSQL as the single system of record. No graph database, no vector store in the core path. Boring where it should be boring.

North-star metric
Time to First Connected Operational Twin
Minutesnot quarters
Symbench

See your operation
as one connected system.

Bring four exports to the first session. Leave with your own operational twin — live, traceable, and queryable in plain English.

Start a pilot workspace
team@symbench.com

Plans from $18,000 / year · Builder / Pilot · Growth · Enterprise Connect